top of page
Search

Progress on the construction site

  • lgarrels
  • Jul 8
  • 1 min read

Since February, a small group of five Indian craftsmen have been patiently crafting the ground floor joists. A total of 250 wooden components are being planed and carved from the rough-sawn beams, each up to 6 meters long. The stock of rough-sawn beams is dwindling, while the stock of joinery is growing, as is anticipation for the construction phase.

ree
ree
ree

 
 
 

Comments


© 2024 by Sukha - Home of Wisdom | all rights reserved

Imprint/Privacy Policy

bottom of page